In the modern period of time any development programme is to taken after pre-requisition of planning. It is very necessary in a project of engineering and also basic need in highway development programme. It includes estimation of future and current traffic volumes on a road system. If the funds available are less than the total requirement then to fix the priorities planning is very important. To get the following points planning of highway is to be done.
(i). With the available funds a good quality road to be given with a maximum length.
(ii). The planning of highway is to done phasewise for development of roads if the funds are not available to construct the whole road network.
(iii). The financial system of roads may be worked out by planning of highway.
(iv). The planning of highway to be done in such a way that the widening and improvement of existing road also consider with the construction of new road.
(v). The priorities to construct of road may be fixed in the planning of highway. If all the roads can not be constructed with the available funds then within the planned period most wanted road may be considered for Construction.
(vi). In planning of highway shortest route to be considered to minimize the cost.